Sonotube Concrete Calculator for Round Footings and Pier Posts

Piers with bell footings, rebar cages, soil bearing & strip footings

Generated by QuickTonnage.com ·

Footing Type
Round Sonotube piers or a continuous strip footing
in
ft
Flared Bell-Bottom Base
BigFoot-style widened footing base under the tube
in

Common BigFoot sizes: 20, 24, or 28 in.

in
ft
in
in

Total Concrete Needed

–cubic yards

– cu ft

🚚 Ready-Mix Truck Order
Enter your dimensions and calculate to see whether this job needs bagged concrete or a ready-mix truck.
–
80 lb bags
–
60 lb bags
–
50 lb bags
⚠️ This order is below most plants' 5 yd³ full-load minimum — expect a short-load fee (commonly $75–$200) from the ready-mix supplier.
Rebar & Cage Takeoff
Vertical rebar with hook bends, plus ties per pier
Vertical Rebar Length per Bar (incl. 90° hook)– ft
Total Vertical Rebar (all piers, +10% waste)– ft
20 ft Rebar Sticks Needed–
Tie / Spiral Loops per Pier–
Total Tie Wire (all piers)– ft
Total Horizontal Rebar (+10% waste)– ft
20 ft Rebar Sticks Needed–

Hook extension uses a standard rule of thumb of ~12× bar diameter. Verify exact rebar size, cage design, and cover requirements against your local building code or engineer's plan.

Soil Load Capacity & Pier Sizing
Check whether your pier diameter and count can carry the load
lbs

Include dead load (structure weight) + live load (people, snow, furniture). A rough deck rule of thumb is ~50–60 lb/ft² total design load.

psf
Recommended Minimum Pier Diameter
– in

⚠️ This is a simplified planning estimate, not a stamped structural or geotechnical design. Actual soil bearing capacity varies by site and depth confirm with a soil test or local engineer before finalizing pier size, especially for habitable structures.

$
Estimated Ready-Mix Cost$–
$
Estimated Bag Cost$–

Estimates are approximate and based on standard tube sizes, rule-of-thumb rebar detailing, and typical soil bearing values. Always verify final pier size, embedment depth, frost line, and reinforcement with your local building code or a licensed engineer before construction.

How to Use the Sonotube & Footing Calculator

Pour concrete piers and footings without guessing at rebar or soil capacity. QuickTonnage's sonotube concrete calculator handles round piers, bell-footing bases, and continuous strip footings in one tool.

  1. Choose Round Piers or Continuous Footing.
  2. Enter pier count, tube diameter, and pour height.
  3. Turn on a bell footing base if your piers flare at the bottom.
  4. Open "Pro Details" for rebar cage sizing and soil bearing capacity.
  5. Review your concrete volume and bag-or-truck order.
  6. Add a price to see your total cost.

Concrete Needed by Sonotube Size

Common sonotube diameters need very different amounts of concrete per foot of height. Here's a quick guide.

  • An 8-inch sonotube uses about 0.28 cubic feet of concrete per linear foot.
  • A 10-inch sonotube uses about 0.44 cubic feet per foot.
  • A 12-inch sonotube uses about 0.63 cubic feet per foot.
  • An 18-inch sonotube uses about 1.4 cubic feet per foot.

Multiply by your pour height and pier count to get your total or skip the math and let this sonotube concrete calculator do it for any size you enter.

Sonotube & Footing Calculator FAQ

How much concrete do I need for a 12 inch sonotube?

About 0.63 cubic feet per foot of height. A 4 ft tall 12-inch pier needs roughly 2.5 cubic feet, or about 4–5 bags of 80 lb concrete mix.

How many bags of concrete does it take to fill a sonotube?

It depends on the tube diameter and pour height. This concrete footing calculator gives an exact bag count for any size you enter.

What is a bell footing, and do I need one?

A bell footing is a widened base at the bottom of a pier that spreads the load over more soil. It's common on deeper piers or softer soil conditions.

Do I need rebar in a sonotube pier?

Most structural piers use vertical rebar with a 90° hook into the footing. Check your local building code for exact requirements.